Skip to content

Menu

Free GPIM Assessment Contact Us

JPEN

GPIM — GROUND Process Improvement Methodology at Warehouse

Free GPIM Assessment (Logistics Center Operations Maturity)

Free / 20 questions · About 10 minutes / Quick result shown without entering your details
GROUND Inc.
Consulting & Engineering
Your previous answers are saved

GPIM Free Assessment

Where does your logistics center operation stand today?
Twenty questions clarify your position and next move.

Based on GPIM, the maturity model GROUND uses in logistics transformation projects, the assessment rates 20 operational areas in management, execution, and the operational foundation in 6 categories (Initial to Autonomize). The assessment is free. When you finish answering, you first see a quick result (the balance across functional areas and an analysis of the causes of the issues you entered) on the spot without entering your details, and you can then view the detailed report (level assessment, 20-area map, priority themes, and improvement roadmap). You can also print it or save it as a PDF.

What is GPIM? GPIM stands for GROUND Process Improvement Methodology at Warehouse. It is an improvement methodology that views logistics center operations in five levels (Systematize → Visualize → Automate → Optimize → Autonomize) and advances them in a manageable order. This assessment adds the Initial state (Lv0) before them and places your current position in one of 6 categories.

Time required
About 10 min
Questions
20 (6 choices each)
Cost
Free
Results
Instant (no details needed for the quick result)
What you get

What this assessment tells you

01Current maturityWe assess where your logistics operations stand in 6 categories (Initial to Autonomize) and visualize it with a radar chart by functional area and a map of the 20 areas.
02Key issues and room for improvementWe identify the areas that fall short for moving to the next level and what they are missing.
03Priority themesStarting from the areas that are the bottleneck for the whole operation, we suggest an order in which to start.
04Direction for improvementDepending on the results, we explain how GWES (logistics optimization software) and consulting could support you.
How we assess: In GPIM, higher levels assume the capabilities of lower levels. The overall level is not the average of the area levels; it depends on the area that lags furthest behind (the bottleneck area). That is why it becomes clear where you should start.

Answers are multiple choice. You do not need to export performance data or connect any systems; the person who knows the site best can answer based on their own understanding.

Twenty questions, about 10 minutes / You can go back to earlier questions
Want to talk with us first instead of taking the assessment?

This assessment is a simplified evaluation based on your answers. A detailed current-state analysis and benefit estimates that reflect your specific conditions are proposed individually after a consultation.

Step 02 — Profile

Tell us about the facility being assessed

All fields are optional. Your answers help tailor the explanation of the results to your situation.

Installed automation equipmentMultiple choice, optional
Issues you currently faceMultiple choice, optional
The questions (20 in total) start from the next step
Step 07 — Your information

Continue to the detailed report

To receive the detailed report (overall level assessment, 20-area map, priority themes, improvement roadmap, and direction of support), please enter your details.

Support you are interested inMultiple choice, optional