Implementation & Results
Implementation & Results
We introduce the phased GWES implementation approach (4 phases) and our implementation track record.
01Implementation
A Phased Implementation Approach
We implement GWES in 4 phases. We confirm results in each phase before moving to the next step, which keeps investment risk to a minimum. ROI is typically recovered in 12–18 months.
PHASE 1
Current-State Assessment
Systematize
We systematically assess current operating processes and evaluate the maturity of each area. We then develop an improvement roadmap.
PHASE 2
Building the Visualization Foundation
Visualize
We deploy WF, PA, and WA and build the data foundation. This enables workload forecasting, progress visualization, and load analysis.
PHASE 3
Rolling Out Optimization
Optimize
We deploy SO, RO, RA, and other modules to optimize inventory placement, travel paths, and staffing. We measure the results quantitatively.
PHASE 4
Network-Wide Rollout & Autonomy
Autonomize
We roll out proven modules to all sites. We enable autonomous execution of the optimization logic step by step.
02Results
Results & KPIs
GWES has delivered measurable results for both logistics operations and management.
75%
Reduction in planning workload
90%+
Workload forecast accuracy
40%
Reduction in walking distance
25%
Reduction in delivery costs
Productivity gains
Improved work productivity
80%
Reduction in anomaly response time
Further gains
Reduction in labor costs
100+
Sites deployed worldwide
All modules
FIRST STEP
See where you stand with a free GPIM assessment
We clarify which level your logistics facility is at now and what to do next.
Explore other options